The Commission awarded DVG $128,500 to cover 75% of initial engineering, design, permitting, and legal work associated with developing the DVG project. Engineering teams have now been engaged by DVG and Bion and have begun design work to support conditional use permit applications. The applications are expected to be submitted within two months, at which time a public hearing will be scheduled for soon after.