Tyrolon’s know-how is already being put to use on KHS lines, with established equipment such as conveying stars and neck clamp systems to be jointly further developed.
The advantages of choosing refurbished or hybrid conveyors, especially when considering bottle conveyors, are numerous and extend beyond simple cost savings.
This facility is expected to begin production in 2026, and at peak capacity, will produce 2.7 million beverage bottles per day across six production lines.
Caddo Mountain Spring Water is working with RPPY Architects to design a 140,000-square-foot premium water bottling facility—expandable to 200,000+ square feet—at its spring/artesian source water property in Arkansas.