Food Engineering logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Food Engineering logo
  • NEWS
    • Latest Headlines
    • Manufacturing News
    • People & Industry News
    • Plant Openings
    • Recalls
    • Regulatory Watch
    • Supplier News
  • PRODUCTS
    • New Plant Products
    • New Retail Products
  • TOPICS
    • Alternative Protein
    • Automation
    • Cannabis
    • Cleaning | Sanitation
    • Cross-Functional Food Innovation
    • Fabulous Food Plants
    • Food Safety
    • Maintenance Strategies
    • OEE
    • Packaging
    • Sustainability
    • More
  • EXCLUSIVES
    • Plant Construction Survey
    • Plant of the Year
    • Sustainable Plant of the Year
    • State of Food Manufacturing
    • Top 100 Food & Beverage Companies
  • MEDIA
    • Podcasts
    • Videos
    • Webinars
    • White Papers
  • FOOD MASTER
  • EVENTS
    • Food Automation & Manufacturing Symposium and Expo
    • Industry Events
  • RESOURCES
    • Newsletter
    • Custom Content & Marketing Services
    • FE Store
    • Government Links
    • Industry Associations
    • Market Research
    • Sponsor Insights
    • Classified Ads
  • EMAGAZINE
    • eMagazine
    • Archive Issue
    • Advertise
  • SIGN UP!
Engineering R&D

5 Things Food Manufacturers Should Know Before They Grow

By Mallory Wright
Design planning
cookie_studio via freepik
August 28, 2026

Often, the factors that derail future expansions are the ones nobody’s talking about. These five overlooked details can make a facility more flexible — or more fragile than expected.

Designing an expandable facility can get overwhelming fast. Small details get missed, and those little misses can cause major trouble later. Expansion doesn’t fail dramatically all at once — it fails because dozens of small decisions quietly remove future options. 

Dennis Group engineers and project managers with years of experience designing and executing expansions in food and beverage manufacturing discuss the lesser-known factors that can make or break a plant’s long-term expandability. From their insights, we pulled together a list of five areas that sometimes go overlooked. It’s far from a comprehensive list, but it’s one worth reviewing. 

This isn’t textbook engineering: it’s real experience, real lessons learned and knowledge that might just make you a hero on your next project. Whether you’re designing a greenfield or an expansion, make sure you’ve got these details covered.


Wastewater

Expanding food and beverage operations can mean a range of wastewater challenges. Facility expansions often bring new product lines, which introduce new ingredients, different cleaning processes and higher‑strength effluent. 

What a facility produces and its downstream impacts on municipal infrastructure is surprisingly complex. A single oily, fatty or water-soluble product line can disrupt or kill the microorganisms in a city’s wastewater treatment system, potentially shutting it down. 

Jacqueline Kull, Dennis Group’s head of sustainability and site search, has experience assessing wastewater risks during site selection and expansion planning and working directly with cities to resolve them. “If the municipality can’t handle the increased load,” she notes, “the cost of upgrading your facility’s wastewater treatment late in the project can be significant — sometimes over $10 million, even for low‑volume manufacturers.” 

Kull added it can take 2-5 years for municipal improvements to accommodate industrial wastewater treatment, so many expanding manufacturers install pretreatment on their own sites.

These implications underscore the importance of addressing wastewater requirements early in the design process. An initial check‑in with an environmental engineer can validate local capacity and determine whether pretreatment will be needed, helping teams design a system that can adapt to future loads without costly retrofits.


Centralized Thermal Utilities

Centralized thermal utilities like steam, boilers, refrigeration and process heating/cooling are challenging systems to plan for future expansion, because their constraints are easy to downplay early on. Smaller, decentralized equipment such as air compressors or standalone water heaters can usually be added incrementally, but systems like steam, boilers and refrigeration rely on shared infrastructure that’s difficult and disruptive to modify once a facility is operational.

Oversizing these systems upfront may seem like the right move, but it introduces a delicate balance between planning for growth and overengineering. Thermal systems that are too large often struggle with turndown limitations, operate inefficiently at low loads and require energy‑wasting fixes like bypass loops, throttling valves or bleed systems just to function as intended. A more flexible approach is to oversize utility rooms, corridors and access paths (instead of the equipment itself) and to plan thermal utilities in modular phases. 

Senior Partner Trent Moore highlighted a utilities design strategy on a recent project where a client is planning a phased approach to expanding their plant. Instead of installing an oversized header up front, the project team designed the pipe rack system with space for multiple right‑sized headers that can be added as demand increases, allowing systems to perform efficiently at each stage of growth. 

Modular planning gives teams room to adapt early on, but a solid production forecast still plays an important role in right‑sizing utilities and ensuring they operate efficiently at every phase of their growth.


Egress and Fire‑Rated Wall Construction

Egress and fire‑rated wall construction may seem like minor early‑stage details but not accounting for them can quickly cause big problems. Fast and safe evacuation is critical in manufacturing environments, so exit spacing and where to locate fire-rated wall assemblies deserve early attention. 

For a moderate‑hazard facility with a sprinkler system, the International Building Code (IBC) generally limits exit travel distances to 250 feet, with the ability to stretch that to 400 feet under the right conditions (such as higher ceilings and suitable facility layouts). As facilities expand, the distances to exits also grow, and what once worked can suddenly fall out of compliance. 

Understanding these limitations and planning for them early in a project makes all the difference. Higher clear ceiling heights, well‑placed fire‑rated corridors, and fire‑rated building separations can all provide flexibility by effectively “resetting” travel distances as the building grows. Lower ceilings are another option, dramatically reducing allowable distances (sometimes down to 200 feet) and tightening layout options. 

For many clients, investing in higher ceilings for conditioned spaces or constructing additional fire-rated walls for future needs can feel painful and costly upfront, but the added cost is minimal compared to the expense and disruption of retrofitting an active facility later.


Stormwater

Though stormwater is underground, it can quietly become one of the biggest barriers to future expansion. Stormwater is often designed to the bare minimum required for an initial building footprint, with little consideration for what comes next. 

As facilities expand, that early decision quickly becomes a constraint. Adding roof area increases runoff, and undersized storm lines can force new tie‑ins, pipe replacements or drainage rerouting. This in turn can require excavation near active buildings, complex grading changes, and additional permitting or environmental review. Poor grading and drainage paths may also block logical expansion zones entirely. Stormwater is especially difficult and expensive to fix after the fact since it affects site layout, elevation and regulatory compliance all at once. 

A more resilient approach is to plan stormwater infrastructure as a backbone for future growth. Project Manager Steven Murray says he was happy with the stormwater design on a recent greenfield project in the Southeast, where a large diameter (48‑inch) stormwater main was installed early to support a much larger future roof area. The building also features interior roof drains that route water vertically into the stormwater main, avoiding exterior downspouts and piping that would need to be redesigned in the future on the expandable face of the building. 

Thoughtful stormwater planning upfront can preserve site flexibility, reduce disruption and avoid some of the most challenging retrofits a growing facility can face.


Dock Loading Positions

Dock loading positions affect everything from site grading and foundation walls to truck circulation, safety and business continuity. When dock locations and future capacity aren’t considered early, adding new docks later can become highly disruptive. 

Cutting new dock openings through exterior walls not designed for them often requires new foundations, structural reinforcement and slab replacement — expensive, time-consuming work difficult to perform in an active facility. Expansion‑driven construction can also interfere with truck traffic, forcing vehicles through construction zones, slowing operations and progress, and creating potential safety concerns. Pausing shipping and receiving is rarely an option, and while temporary docks may be a workable solution for a time, they’re often impractical or fail to meet code requirements. 

These challenges can be avoided with careful upfront planning. Chris Siart, senior partner and building systems lead, highlighted the benefit of designing “plugged knock‑outs,” which allow exterior walls and slabs to accommodate future dock loads, turning what would be a costly redesign into controlled, predictable construction. He also noted the importance of planning dock locations and truck access so future building expansions occur away from active docks, allowing shipping and receiving to continue uninterrupted. A bit of extra consideration for dock planning preserves flexibility, protects a client’s operations and prevents one of the most disruptive expansion obstacles facilities can face.


Small Choices, Big Impact

Expandability isn’t defined by any single big decision: it’s shaped by dozens of small, early choices that either preserve or limit future options. Every project team must balance flexibility and expandability differently depending on the clarity of a client’s future plans, but the earlier these conversations arise, the better the outcomes. 

While no design effort is perfect, the discipline of capturing lessons learned and carrying them into the next project is critical. Thoughtful planning isn’t about avoiding every challenge. It’s about ensuring the facility has room to evolve long after construction is complete.

KEYWORDS: design/build docking engineering utilities wastewater treatment

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Mallory wright dennis group

Mallory Wright is marketing manager for the Dennis Group.

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • CJ Schwan’s Salina facility.

    Recipe for Growth: How CJ Schwan’s Powers Pizza Production with People and Automation

    Blending advanced automation with purposeful design, this...
    Plant of the Year
    By: Alyse Thompson-Richards
  • Paris Baguette rendering

    FOOD ENGINEERING’s 49th Annual Plant Construction Survey

    Food and beverage manufacturers continue to invest in...
    Plant Openings
    By: Alyse Thompson-Richards
  • Bottling machine

    How Optical and X-Ray Inspection Supports Bottling Safety and Quality

    By transitioning from legacy single-technology systems to...
    Food Safety
    By: Dan McKee
Manage My Account
  • eMagazine
  • Newsletter
  • Online Registration
  • Manage My Preferences
  • Customer Service

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Food Engineering audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Food Engineering or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • An old and tattered manual titled 'Revised 5/20/1971' on a desk along with a cellphone, sunglasses, Apple iWatch, laptop and keyboard, and a water bottle.
    Sponsored byEnSight Solutions

    Redefining Quality: Has the Industry Lost Sight of What Actually Matters?

  • Worker in protective food-processing attire uses a tablet beside stainless-steel conveyor equipment in a modern food manufacturing facility.
    Sponsored bySafetyChain

    Your Biggest Losses Are Hiding in Data You Already Have

  • Stainless steel conveyor system transferring cut food pieces—likely pasta or fries—through an enclosed industrial processing line using a flexible hose and screw conveyor in a manufacturing facility.
    Sponsored byHapman

    What’s Slowing Down Your Bulk Material Handling Process?

Popular Stories

Top Seedz Plant exterior

Top Seedz Gains the Advantage with Automated Cracker Production

Beef steaks

Tyson Foods to Close Two Beef Facilities

Granola

Roskam Foods to Close California Plant as Part of Cereal Production Consolidation

Promo for the 2026 Plant of the Year: CJ Shwan

Events

September 23, 2026

An In-Depth Look at 2026's Top 100 Food and Beverage Companies

Join Lynn Dornblaser, Client Advisor at Mintel, and Alyse Thompson-Richards, Editor-in-Chief of FOOD ENGINEERING, as they break down the 2026 Top 100 Food and Beverage Companies and discuss the factors affecting this year’s rankings.

October 15, 2026

Exploring FOOD ENGINEERING’s 2026 State of Food Manufacturing

The webinar will examine how these trends are impacting every stage of the manufacturing process, from research and development through production, distribution and fulfillment.

View All Submit An Event

Products

Recent Advances in Ready-to-Eat Food Technology

Recent Advances in Ready-to-Eat Food Technology

See More Products

September 23 FE Editorial Webinar


CHECK OUT OUR NEW ESSENTIAL TOPICS

Alternative ProteinAutomationCleaning/SanitationFabulous Food Plants

Food SafetyMaintenance StrategiesOEE

PackagingSustainability

Related Articles

  • worker safety

    5 things food manufacturing leaders need to know about non-desk employees

    See More
  • Stop the leaks before they stop your business

    See More
  • FDA inspection

    What you need to know before an FDA visit

    See More

Related Products

See More Products
  • Military Food Engineering and Ration Technology

See More Products
×

Elevate your expertise in food engineering with unparalleled insights and connections.

Get the latest industry updates tailored your way.

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Food Master
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletter
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Reprints
    • Market Research
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing