CMI supported over 350 construction-related jobs during the development of the plant and expects to add an additional 150 jobs once the facility opens in the fall.
The expanded facility, which is located at 12725 4 Mile Road in Franksville, Wis., stands at over 334,000 sq. ft., featuring 32 dock doors and 37,500 pallet positions.
Equipped with modern culinary tools, Stampede’s research and development team simulates the exact heating and cooking methods that customers use in their own operations.
Additionally, in response to the recent fires in the Los Angeles area, Cascade Milling donated nearly 8 tons of its Just-Add-Water Organic Pancake & Waffle Mix to the Los Angeles Regional Food Bank.
The investment will more than double the site's granola packaging capabilities, enabling Richardson to increase production and better meet evolving customer needs.
The new facility is to integrate design engineering, manufacturing, assembly, quality control, shipping and other operations under one roof for greater production efficiency.