Manufacturers are expanding capacity and modernizing operations amid growing project complexity, tighter schedules and increasing technology demands. Integrated project delivery brings engineering, procurement and construction teams together from the outset, helping improve collaboration, reduce risk and create greater certainty around cost, schedule and facility performance.
Envision aims to streamline the complexities of new food and beverage facility construction by offering both standardized, in-stock drainage solutions and custom-designed products.
The 386,047-sq.-ft. refrigerator/freezer distribution facility in Florence, South Carolina includes 45 loading docks, a Cheney Express and the largest culinary kitchen the company has developed to date.
By combining the strength and resilience of concrete with the precision of controlled manufacturing, precast offers a durable, sanitary and schedule-efficient system uniquely suited to the modern food industry.
PFlow’s adjustable bolted bracing eliminates the need for site welding and cutting, enabling a safer and more efficient installation process in facilities where hot-work is prohibited.
Holladay’s Rickhouse D will be constructed over the course of eight to nine months, in partnership with St. Joseph, Missouri-based construction company Al J. Mueller.
The new set of AI-based features provide access to automated measurements, layouts, editing and reporting capabilities generated from a Matterport digital twin of a property.